The call you’ve been waiting months, sometimes over a year, for has finally come. Your builder has been in touch to let you know your Baldivis home is nearing completion, and handover is on the horizon. It’s an exciting moment. It’s also one of the most important moments in the entire building process, and what you do in the next 10 business days can make a significant difference to the home you walk into on handover day.
The vast majority of people building a new home in WA sign a building contract with their builder before a single brick is laid. They watch the slab go down, the walls go up, and the home takes shape over many months. And then, when the builder calls to say it’s nearly done, many of them arrive at handover without having had a single independent inspection, trusting that a brand new home built under council-approved plans is defect-free. In our experience, that trust is often misplaced.
| THE BALDIVIS BUILDING BOOM Baldivis has been Perth’s #1 suburb for land sales for four consecutive years. With over 15 active estates and hundreds of new homes completing every year, the area represents one of the highest concentrations of new build activity in WA. And with builders managing dozens of concurrent projects across multiple sites, the conditions that create defects, including time pressure, subcontractor variability, and limited quality control at each stage, are present on almost every site. |
Why the Builder’s Call Is Your Trigger to Book an Inspection, Immediately
When your builder notifies you that your home is approaching practical completion, they are typically working to a 10 business day rectification window before your handover date. This is the period in which any defects identified must be addressed before you take possession of the property.
This timeline matters enormously. If you wait until after you receive the handover call, or worse, until after you’ve attended the builder’s handover appointment, you may find yourself taking ownership of a property with defects that are now much harder to get rectified or even worse your responsibility to fix, at your own cost. The practical completion inspection needs to happen before handover, not after it.
| IMPORTANT: HOW THE TIMELINE WORKS Builder notifies you of near-completion → You book your Bestwest Building PCI immediately → We inspect and deliver your report on the same day → You have documented defects in hand → Builder has 10 business days to rectify before handover → You attend handover knowing exactly what’s been fixed and what to look for. Do not attend your builder’s handover appointment without a professional inspection report in your hands. |
What Our Inspectors Commonly Find in Baldivis New Builds
Baldivis is a fast-growing suburb with enormous building activity. Builders are working at scale across multiple estates simultaneously, and the pace of construction, combined with subcontractor variability, means defects are common even in homes built to approved plans. These are the issues our inspectors find most regularly in Baldivis new builds:
- Roof frame defects: inadequate bracing, incorrectly installed hanging beams, and structural members that don’t comply with building code requirements
- Waterproofing failures: particularly in wet areas, non compliant tiling and shower recesses
- BCA non-compliance: items that don’t meet mandatory Building Code standards but have not been caught during the build process
- Brickwork issues: inconsistent mortar joints, inadequate ties, missing flashings and debris in cavities
- Incomplete or defective rendering: around window reveals, external corners, and transitions between materials
- Drainage issues: stormwater management that doesn’t flow correctly away from the home, or falls back toward the structure
- Missing, incorrectly installed, or insufficient insulation
- Defective or incomplete fit-off items: fixtures and fittings not correctly installed
None of these are visible during a walk-through without specialist knowledge. They require a trained eye, access to the roof space, and the experience to know where builders most commonly cut corners under time pressure.
| THE FUNDAMENTAL RULE OF NEW BUILD INSPECTIONS If a defect is identified before handover, your builder is legally required to rectify it at their own cost. If you discover the same defect after settlement, it can become much harder to force the builder to rectify. This is the single most important reason to book your inspection the moment your builder makes contact. |
What Happens During a Practical Completion Inspection in Baldivis
A practical completion inspection (PCI) is a thorough, independent assessment of your completed home conducted by one of Bestwest Building’s registered builders. It is entirely separate from any inspection your builder may carry out themselves. We are independent, we work for you, and our report reflects the true condition of the property.
What our inspectors assess during a Baldivis PCI:

- Full structural assessment: roof frame, walls, slab, and load-bearing elements where visible
- Roof covering, ridge, hips, valleys, flashings, gutters, and downpipes
- All wet areas: bathrooms, ensuite, laundry
- Windows, doors, and sliding door thresholds: operation, sealing, and compliance
- Brickwork, rendering, and all external finishes
- Electrical and plumbing fit-off: all visible and accessible elements
- Insulation installation throughout roof void
- Driveway, paving, paths, and site drainage
- All fixtures and fittings (lights, taps, sinks, etc)
Your report is delivered digitally the same day, complete with full resolution photographs of every defect identified. We then walk you through the findings so you understand exactly what needs to be raised with your builder before handover.
| Issue / Repair Type | Typical Perth Cost Range |
| Practical completion inspection (standard home) | $995 – $1495 |
| Builder rectification of minor defects (typical range) | $1,000 – $3,000 |
| Builder rectification of structural defects (typical range) | $3,000 – $25,000+ |
| Same defects found after settlement | Identical, but much more difficult to have the builder rectify |
What If You Didn’t Get Inspections During the Build?
Many homeowners building in Baldivis reach practical completion without having had stage inspections during the build, including slab, walls, or waterproofing and roof cover inspections. This is more common than people realise, and if it applies to you, the practical completion inspection is even more critical.
While stage inspections give you the earliest possible opportunity to catch defects before they’re buried behind walls and ceilings. A thorough practical completion inspection in Baldivis will still identify the majority of issues that matter at completion. Our inspectors know exactly where to look and what builders in this area most commonly miss, regardless of whether earlier stages were independently inspected.
It is never too late to book an inspection. The right time is always before handover, not after.
Stage Inspections: The Strongest Protection for Baldivis Builds Still in Progress
If you’re building in Baldivis and haven’t yet reached practical completion, stage inspections give you the most comprehensive protection available. Each inspection is conducted before the next stage of construction begins, which is critical, because once concrete is poured or frames are clad, hidden defects become extremely costly to access and rectify.
Key inspection stages for a Baldivis new build:
- Slab inspection: before the slab is poured, checking formwork, reinforcement placement, and drainage
- Brickwork/framing inspection: before the roof frame begins, checking structure, lintels, flashings, wall ties, tie down placement, cavity insulation, dimensions of main habitable rooms etc.
- Roof Frame inspection: before roof cover begins, checking the roof frame; rafters, ridgeboards, battens, collar ties, hanging beams, strutting beams, ceiling joists etc for compliance. We will also check on the rectification of any previously listed brickwork defects.
- Waterproofing & roof cover inspection: before wet area tiling is completed, checking waterproof membrane installation, roof covering, flashings, and all concealed elements
- Practical completion inspection: a final thorough overview of the entire home and all accessible building elements inside and out.
Each stage inspection gives you a documented digital record of the property’s condition at that point, and any significant defects identified should be addressed by the builder before major works continue. Some minor defects can be left until later in the building journey.
| Issue / Repair Type | Typical Perth Cost Range |
| Slab inspection | $495 – $695 |
| Brickwork/Framing inspection | $495 – $695 |
| Roof framing inspection | $495 – $695 |
| Waterproofing & roof cover inspection | $495 – $895 |
| Practical completion inspection | $995 – $1495 |
| Full stage inspection package | Contact us for package pricing |
Baldivis Estates: What Our Inspectors Know About Building in This Area
With over 15 active estates in Baldivis, including Brightwood, Millars Landing, Paramount, Rivergums, The Edge, Oasis, Greenlea, Baldivis Parks, Woodlands, and Spires, and there is enormous variety in the builders operating across the area. Our inspectors are familiar with the landscape of Baldivis construction and bring specific local knowledge to every inspection.
One important point: building covenants set by the estate developer are entirely separate from the Building Code of Australia and are typically beyond the scope of an independent building inspection. A home can fully comply with an estate’s design guidelines and still have BCA non-compliance defects.
Book Your Baldivis Practical Completion Inspection with Bestwest Building
Don’t wait until after handover. The moment your builder makes contact to advise your home is nearing completion is the moment to call us. Bestwest Building’s extensive team of highly experienced registered builders covers Baldivis and the entire Perth south corridor. We offer practical completion inspections, construction progress inspections, and pre-purchase inspections for established homes.
Same-day reports. Direct consultation with your inspector. Over 45,000 inspections of experience. Get a free instant quote at bestwestbuilding.com.au or call us on (08) 9444 9562.
Frequently Asked Questions about Practical Completion Inspections in Baldivis
Book as soon as your builder notifies you that the home is approaching completion, so don’t wait for the official handover call. Builders typically work off a 10 business day window to rectify defects before handover, so the earlier your inspection is completed, the more time there is for rectification before your settlement date. Call Bestwest Building on (08) 9444 9562 or get an instant quote at bestwestbuilding.com.au as soon as you get word from your builder.
A professional inspection report from Bestwest Building is a formal document that details every defect with photographs and references to the relevant Australian Standard or Building Code. Builders are legally required to rectify BCA non-compliance issues before handover. In our experience, reputable builders address defects when presented with a professional report. The inspection report gives you the documentation to hold them accountable. If they refuse to rectify defects even when presented with the relevant information, you can contact the building regulator and lodge a formal complaint.
It’s not too late. The practical completion inspection is your most important opportunity regardless of whether you had stage inspections during the build. We find significant defects at Practical Completion stage on a regular basis, including structural issues, waterproofing failures, and BCA non-compliance items, that the builder must rectify before handover. Don’t let the absence of earlier inspections put you off getting one now.
A practical completion inspection with Bestwest Building typically costs between $995 and $1495 depending on the size and type of property. Get an instant personalised quote at bestwestbuilding.com.au, available 24/7.
Yes, but treat it as a separate event to the building inspection. The builder’s handover appointment is designed to walk you through the home and demonstrate how things work. Your Bestwest Building inspection report should be in your hands before that appointment, so you arrive knowing exactly what defects have been identified and what the builder has agreed to rectify. The two events serve very different purposes.